Demo site by Levelwork, showing what a roofing website can do. It doesn't take bookings yet.
Bauer BrothersRoofing

Services

Roof Replacement in Fort Myers, One Crew Start to Finish

Shingle, concrete tile and metal re-roofs in Fort Myers, taken to the deck, re-nailed and sealed to code, with one crew start to finish.

Roofer on a brick home during a roof tear-off

Roof replacement

Roof replacement in Fort Myers is a bigger job than it looks from the driveway. The shingles or tile are the part you see, but the work that decides how the roof does in a hurricane happens underneath: how the deck is nailed, how its seams are sealed, how the underlayment is laid and how the edges and walls are flashed. We do all of it with one crew, and the crew lead who prices your roof is the one standing on it while it goes on.

What gets replaced

A full re-roof here means taking everything down to the deck, the plywood or planks the roof is built on. Here’s what happens after that, in order:

  1. Deck check. Every sheet gets looked at once it’s bare. Soft, rotted or delaminated wood is cut out and replaced, and we photograph it first so you see why it’s on the invoice.
  2. Re-nailing. The deck is fastened to the current code pattern. On many older Lee County homes this is the single biggest strength upgrade in the whole job.
  3. Sealing the seams. Florida’s code calls for a secondary water barrier on re-roofs, so water that gets past the roof covering in a storm still can’t run through the gaps between deck sheets.
  4. Underlayment and edges. New underlayment across the whole roof, new drip edge, and new flashing at every wall, chimney, vent and skylight. We don’t reuse old metal.
  5. The roof itself. Shingle, concrete tile or metal, fastened to the manufacturer’s instructions and the product approval for wind, not to whatever is quickest.
  6. Ridge and vents. Ridge caps, ridge or off-ridge vents and new pipe boots, so the attic breathes and the pipes don’t leak.

Choosing a material

Architectural shingle is the most common roof in Fort Myers and Cape Coral and the lowest price per square foot. Good shingles are rated for high winds when they’re installed with the right nail count and starter strips, and that installation detail matters more than the brand name on the bundle.

Concrete tile is the look on a lot of the newer neighborhoods and the gated communities toward Estero. It’s heavy and long-lived. Tile itself rarely wears out; the underlayment beneath it does, which is why an older tile roof can leak while the tiles look perfect. Replacing a tile roof usually means new underlayment and resetting or replacing the tile.

Standing seam metal sheds water fast, shrugs off the afternoon heat better than dark shingle and holds up well in wind when the clips and fasteners match its approval. It costs more than shingle and less than many tile jobs.

We don’t push one over another. If your house would be fine with any of them, we tell you that and let you choose on looks and budget.

The written price

You get one page, broken into lines: tear-off and disposal, deck repairs at a set price per sheet, re-nailing, the sealed deck, underlayment, the roof covering by name, flashing, vents, the permit and cleanup. The only thing that can change is the number of deck sheets that turn out to be rotten, and the per-sheet price is on the page before you sign, so even that isn’t a surprise. If you’re holding quotes from more than one roofer, our guide to reading a roofing estimate shows how to line them up.

No deposit is due until the permit is issued.

Permits and inspections

Every re-roof needs a permit from the building department that covers your address. Fort Myers, Cape Coral and Estero each handle their own, and unincorporated parts of Lee County go through the county. We work out which office applies before the price is final, file the permit and book the inspections the job needs while it’s underway and at the end. When it’s done, you get copies of the permit, the inspection results and the product approvals. Keep them with your house papers; your insurer may ask for them.

How long it takes

For most single-family homes the work on the roof takes a few days for shingle or metal and longer for tile. Afternoon storms in the summer can stop work early, and we’d rather lose an afternoon than open a roof with lightning on the way. Before that, the permit has to be issued, which can take anywhere from days to a few weeks depending on the office and the season. After a big storm, every office slows down at once. We tell you where the permit stands while you wait, so you’re not left wondering.

Why one crew matters

Roofing companies often sell the job with one person and send whoever is free to build it. That’s when details get lost: the soft spot by the chimney that was mentioned at the inspection, the vent you asked to move, the gate that has to stay closed for the dog. With us, the crew lead who walked your roof is the one running the job, with the same crew from start to finish. They know what was promised because they’re the ones who promised it.

Clean-up

Tear-off is messy, so we lay tarps over the plants and the pool cage, and we put the dumpster where you want it, not where it’s easiest for us. At the end of each day the crew sweeps the driveway and the yard with a magnetic roller, and again on the last day before the final walk-through with you.

Is it time?

Not every old roof needs replacing. If the problem is one leak, a few lifted shingles or a cracked pipe boot, roof repair is the smaller bill and we’ll say so. If a storm just went through, start with a hurricane damage inspection, and if an insurer is involved, our claim paperwork page explains what we provide. We replace roofs across Fort Myers, Cape Coral and Estero.

Roof replacement by town

Guides

Questions about roof replacement

  • Shingle, tile or metal, which should I pick?

    It depends on the house, the budget and how long you plan to stay. Architectural shingle costs least up front. Concrete tile is heavier and lasts longer, but the framing has to be able to carry it. Standing seam metal sits in the middle on price and handles wind well. We price the options you're weighing side by side so you can compare.

  • Why does the price include re-nailing the deck?

    When a roof comes off down to the plywood, Florida's code calls for the deck to be fastened to current standards before the new roof goes on. Older homes were often nailed far more loosely than that, and the deck is what holds the whole roof to the house in a hurricane.

  • Can you replace a tile roof with shingles or metal?

    Usually, yes. Going lighter is rarely a structural problem. If you have an HOA, check its rules first, because many communities around Fort Myers and Estero approve roof materials and colours. We can put the paperwork together for the approval.

  • Do I have to be home while you work?

    No. We need access to the driveway, the yard and power for a few tools, and we'd like to walk the finished roof with you at the end. Most people go about their day and come home to a cleaned-up yard.

Field notes

Jobs like this

Sample projects
Roofer on a brick home during a roof tear-off

Shingle re-roof to the deck with decking swapped at the eaves

Led by Sam, Fort Myers

  1. FoundCurling shingles on the west slope and soft plywood along the eaves where the old roof had no drip edge.
  2. FixedTore off to the deck, replaced the soft sheets at the per-sheet price on the quote, re-nailed the rest and laid architectural shingles with new drip edge.
  3. ResultDry eaves, a fascia that no longer stains, and a final bill that matched the written price line for line.

An older shingle roof near McGregor that the owner knew was getting tired. The tear-off showed why the fascia kept staining: with no drip edge, water had been running behind the gutter for years and softening the plywood at the eaves. Those sheets were swapped at the price already on the quote, the rest of the deck was re-nailed to code and the new roof went on over sealed seams.

Inspector in a hard hat checking a door frame

Low-slope back room roof replaced, tie-in to the main roof rebuilt

Led by Jordan, Fort Myers

  1. FoundA ceiling stain in the back room traced to a split seam on the low-slope roof and a tie-in to the main roof sealed only with mastic.
  2. FixedReplaced the low-slope roof with a new membrane and rebuilt the joint to the main roof with proper step and counter flashing.
  3. ResultNo more drip in the back room through the rest of the rainy season.

A block home off Colonial with a flat-roofed back room added on years after the house was built. The original roof was fine; the add-on was not. Water was getting in at a split seam and at the joint where the two roofs met, which someone had sealed with tar instead of flashing. Jordan priced the add-on roof on its own and rebuilt the tie-in so the two roofs shed water as one.

Every field note

Meet the crew

Who's coming to your house

The person who walks your roof and writes the price is the one who runs the job. You'll know every face on the driveway by name before the first shingle comes off.

Sample crew
  • Worker in a yellow hard hat and safety vest

    Sam

    Crew lead, inspects and runs re-roofs

  • Worker in a white hard hat and safety vest

    Jordan

    Crew lead, repairs and storm calls

  • Smiling worker in a hard hat and safety vest

    Casey

    Roofer, tile and flashing

  • Smiling worker in a reflective vest

    Alex

    Roofer, tear-off and the final sweep

Reviews

What neighbors say about roof replacement

4.9Sample rating

Sample reviews
  • 5 out of 5 stars

    The guy who came out to look at the roof was the same guy running the crew a month later. He remembered the soft spot by the chimney without me bringing it up.

    Dana W., Cape CoralOctober 2026. Sample review
  • 5 out of 5 stars

    They put together the HOA paperwork for our tile colour before the permit even went in. Approval came back without a single question.

    Marisol E., EsteroOctober 2026. Sample review
  • 4 out of 5 stars

    Good job on our re-roof and a fair price. They found more rotten decking than expected, but the per-sheet price was already on the quote, so the extra was no shock.

    Linda S., Fort MyersSeptember 2026. Sample review

Insurance claims

Storm paperwork, ready for your insurer

The claim is between you and your insurance company. Our part is the record of what the storm did to your roof, and if you'd like us there when the adjuster comes, we'll be on the roof too.

  1. A photo set you can forward

    Every slope, every cracked or lifted piece and every flashing joint, each picture dated and emailed to you the day we visit.

  2. A report in plain words

    Where the damage is, how it got there and what happens if it waits, written so your insurer can follow it without a phone call.

  3. A price split line by line

    Tear-off, decking, underlayment, roof covering, flashing and the permit, each on its own line, so the numbers are easy to check.

Never on our side of the table: reading your policy, negotiating or settling the claim, or waiving, rebating or covering your deductible.

Free roof inspection

Book a roof check with the crew

Tell us what's going on up there. We'll call to pick a time, walk the whole roof, then send the photos and a written price.

Worker in a yellow hard hat and safety vest
Worker in a white hard hat and safety vest
Smiling worker in a hard hat and safety vest
Smiling worker in a reflective vest
Sample crew
  • The crew lead who inspects is the one who builds
  • Every line of the price written down before you sign
  • Deck re-nailed and sealed on every re-roof

Rather talk? Call (239) 555-0158

Demo site: this form doesn't send yet.

Call nowFree inspection